Getting there

If I can blag some time on Friday with Steve I hope to have the Oak kitchen worktop fitted, the ash trim between ceiling and walls. Also the kitchen wall including double socket, shaver socket and water pump switch. Steve can also finish the leisure battery box he is so lovingly creating. The ceiling can have it's final coat and the over driver cupboard front fitted. That should just leave the mains hook up to be finished at a later date along with some form of water heating and the fitting of the shower tray/ toilet. Also probably about 300 other small jobs, like spraying it a completely different colour to keep Claire happy!