Next comes the partition between kitchen and living area. Then Brazil ply walls, at the same time fitting the inset LED lights. Then the seats/bed can go in. The drawers need to be cut down and fitted. The shower tray and toilet need to go in. Then the mains consumer unit and 12v fuse board. Then the clean and grey water tanks need to be mounted underneath along with level indicators. Then the cupboard over the driver needs to be insulated, carpeted and closed off. I'll stop now as it's making me depressed!
Still, we should be able to use it for the Cuckoo Beer festival next weekend!!!
Sunday, 7 September 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment