Wednesday, 10 September 2008

Progress

It's taking ages!!
Thanks to Steve we have considerably improved seats and table.
And the living area walls have been covered in Brazil Ply.

The drawer unit has a new top.


We have power!!! Well 12 volt any way. The consumer unit for 230v is fitted but needs the external hook up fitting.
4 of the 6 12v lights are in.


The ceiling only needs 1 more coat and the walls have all had to coats of satin varnish.

The hob, grill and oven are up and running as is the 3 way fridge on gas(It can be gas, 12v or 230v).
The pump and tank are up and running. The taps need to be connected and the waste water tank fitted but for now a pipe out through the floor does the trick. We also have a fancy new water filling cap in the side of the kitchen as you open the back door. NICE ;-)