Sunday, 7 September 2008

The interior

9mm Stirling board flooring laid and carpeted that to a kind donation from Ag Mackeith (Halle's friend).
The ceiling was removed from the old van and due to some funky battening fitted to the new in a slightly better fashion. We had to use a piece of hardboard for the front section due to the new van being about 400mm longer than the old. The fridge/freezer is in place as well ae the hob, grill, oven, sink, water pump, toilet/shower cubicle and wardrobe.

No comments: