skip to main | skip to sidebar

VW LT Camper

Sunday, 7 September 2008

The Transplant

First things first. Insulation and wiring. Using 25mm Celotex and expanding foam the van was insulated on the ceiling and walls. The wiring for 230v and 12v was completed to allow 6x 12v led reading lights, 2x mains lights, a bathroom light, 3x double sockets, 1x shaver socket, pump, fridge etc etc.
Posted by mp at 13:17

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ►  2010 (1)
    • ►  February (1)
  • ►  2009 (43)
    • ►  November (2)
    • ►  October (5)
    • ►  September (3)
    • ►  August (5)
    • ►  July (2)
    • ►  June (7)
    • ►  May (9)
    • ►  March (4)
    • ►  February (2)
    • ►  January (4)
  • ▼  2008 (38)
    • ►  December (1)
    • ►  November (2)
    • ►  October (8)
    • ▼  September (27)
      • Genuine Fake Plates
      • The Smurf Mobile
      • Sound system
      • Putting it all back
      • At last it's blue!!!!
      • Still more paint!
      • Bodywork Progress
      • Bodywork
      • End of the road for the 1978 LT28
      • Sound proofing
      • Breakfast
      • What now?!?!?
      • The other window
      • What remains of the old van?
      • Beer Festival
      • L.E.D
      • Ash worktop in place;
      • Not much to report
      • Getting there
      • Progress
      • What's to do still
      • The interior
      • The scary bit!
      • The Transplant
      • The Low Down
      • The Plan
      • The Donor Camper